Calibration report
Do our numbers mean anything?
A forecast is calibrated when the things it calls 70% likely happen about 70% of the time. Below is every held-out prediction the current model made, bucketed into deciles, against what actually happened — and beneath it, the harder test: the calls this site published before anyone knew the answer.
How this is measured: reliability measured on data the calibrator never saw. A forecast can be made to look perfect by grading it with the same curve that was fitted to it. So the held-out bills are split in half — every prediction for a given bill stays on one side — the calibration curve is fitted on one half, and the 210,495 predictions charted below are the other half. The gaps you can see are the model genuinely missing, not rounding.
Reliability curve — held-out sessions
Predicted decile vs. actual passage rate · perfect calibration = the dashed diagonal
| Predicted decile | Observed passage rate | Bills |
|---|---|---|
| 0%-10% | 3.3% | 73,385 |
| 10%-20% | 15.8% | 25,069 |
| 20%-30% | 26.1% | 17,360 |
| 30%-40% | 36.1% | 13,132 |
| 40%-50% | 45.9% | 13,504 |
| 50%-60% | 56.9% | 12,086 |
| 60%-70% | 65.1% | 8,753 |
| 70%-80% | 74.2% | 11,746 |
| 80%-90% | 85.4% | 10,415 |
| 90%-100% | 97.5% | 25,045 |
These bands come from bills the model never trained on — the two most recent legislative sessions, held out entirely. The calibration curve was fitted on one half of those bills and this table was measured on the other half, so the gaps below are real: this is the model missing, on data its calibrator never saw. The live tracking chart, which scores predictions made on bills before anyone knew the outcome, is the harder test still.
The same predictions, before calibration
What the raw model said, against the same outcomes · the chart above is the calibrated one
| Predicted decile | Observed passage rate | Bills |
|---|---|---|
| 0%-10% | 2.5% | 64,036 |
| 10%-20% | 12.2% | 26,407 |
| 20%-30% | 21.9% | 19,372 |
| 30%-40% | 33.4% | 15,805 |
| 40%-50% | 42.8% | 13,440 |
| 50%-60% | 54.7% | 12,801 |
| 60%-70% | 64.2% | 12,353 |
| 70%-80% | 75.0% | 11,539 |
| 80%-90% | 86.7% | 11,176 |
| 90%-100% | 97.8% | 23,566 |
Read those two together. Before the calibrator, the same predictions scored a Brier of 0.1159; after it, 0.1157. The gain is real but small — most of what the top chart shows was already in the raw model’s ranking, and calibration moved the numbers onto the right scale rather than making them sharper. Neither chart is flattered: both are measured on bills no calibrator here was fitted on, so the bands miss where the model misses. The live table below is the harder test still, because nothing in it was scored after the fact.
Decile detail
Held-out sessions · n = 210,495| Predicted range | Mean predicted | Actual passage rate | Error vs. midpoint | n |
|---|---|---|---|---|
| 0–10% | 3.3% | 3.3% | −1.7 | 73,385 |
| 10–20% | 15.4% | 15.8% | +0.8 | 25,069 |
| 20–30% | 25.3% | 26.1% | +1.1 | 17,360 |
| 30–40% | 35.9% | 36.1% | +1.1 | 13,132 |
| 40–50% | 46.1% | 45.9% | +0.9 | 13,504 |
| 50–60% | 55.3% | 56.9% | +1.9 | 12,086 |
| 60–70% | 65.0% | 65.1% | +0.1 | 8,753 |
| 70–80% | 75.1% | 74.2% | −0.8 | 11,746 |
| 80–90% | 84.7% | 85.4% | +0.4 | 10,415 |
| 90–100% | 97.3% | 97.5% | +2.5 | 25,045 |
Error is the actual rate against the band’s midpoint — for the 60–70% band, how far the outcome landed from 65%. Anything inside ±3 points is left grey; only a miss worth noticing takes a colour, and the colour marks the direction of the miss, not a good or bad result. Bands are ten points wide, so a bill priced anywhere inside one sits up to five points from its own midpoint before the model is wrong about anything.
Live tracking
Every probability published before the bill resolved, scored against what happened
First session in progress — this table fills as bills resolve. Nothing is recorded here until a bill reaches a final outcome and sits through a fourteen-day settle window, so that a veto overridden weeks later is not booked as a loss.
0 bills resolved so far
Every point here is a probability this site published before the bill resolved, scored against what actually happened. Nothing is re-scored after the fact. This chart fills up as bills reach a final outcome, so early on it is thin — a band with a handful of bills in it is not yet evidence of anything.
Want the feature set and the caveats behind these numbers? Read the methodology →